8th Maruti Suzuki Raid-de-Himalaya 2006
RAID 2006 | Leg Details | Leg Three
 
>
 HOME
>
 RAID 2006
>
 LEG DETAILS 
1)    LEG ONE
2)    LEG TWO
3)    LEG THREE
4)    LEG FOUR
5)    LEG FIVE
6)    LEG SIX
7)    LEG SEVEN
>
  RACE RESULTS
>
 SEND SMS

SATELLITE IMAGE (WEATHER)
SATELLITE MAP
(ROUTE)


CLICK HERE TO ENLARGE
DATE:
2nd ctober, 2006
LEG:
Three
TRANSPORT
Kaza-Kaza Gate
1.80 Km's
COMPETITIVE
Kaza Gate-Komic
21.40 Km's
TRANSPORT
Komic-Lingti
42.19 Km's
COMPETITIVE
Lingti-Sichiling
16.57 Km's
TRANSPORT
Sichiling-Lingti 2
5.94 Km's
COMPETITIVE
Lingti 2-Sichiling 2
16.57 Km's
TRANSPORT
Sichiling 2 -Lidang
12.44 Km's
COMPETITIVE
Lidang-Demul
17.50 Km's
TRANSPORT
Demul-Kaza 2
30.70 Km's
LEG START
LEG END
KAZA
KAZA
TERRAIN

. For most part the surface is all dirt and the stage climbs uphill almost all the way through. The drops at most places are huge and I recommend extreme caution while tackling this stage!! From Lingti to Sichiling the stage is run over a continuously winding road. Most of the turns are very sharp. The road surface is partly dirt and partly tarmac. The stage climbs uphill for the first 8 kms (all dirt) and then descends for the next 8 kms (all tarmac). The road at the top of the climb, near Dankar Gompa, is very narrow and winding. The drops at most places are huge.
Tthe competitive section from Lidang to Demul runs over a continuously winding road, at places narrow though often flowing and fast. Many of the turns are very sharp. The surface is all dirt and the stage climbs uphill for the first 13 odd kms.

WEATHER
TEMPERATURE:
Hi: 14 Lo: -5(In Celsius )
HUMIDITY:
31 %
CLIMATE: Sunny
(Temprature Details Shown Above Are From Raid Start Point- Kaza.)
SPONSORS



[ Home ] [ Contact Us] [ About Us]
Copyright © 2006 www.raid-de-himalaya.com