8th Maruti Suzuki Raid-de-Himalaya 2006
RAID 2006 | Leg Details | Leg Seven
 
>
 HOME
>
 RAID 2006
>
 LEG DETAILS 
1)    LEG ONE
2)    LEG TWO
3)    LEG THREE
4)    LEG FOUR
5)    LEG FIVE
6)    LEG SIX
7)    LEG SEVEN
>
 RACE RESULTS
>
  SEND SMS

SATELLITE IMAGE (WEATHER)
SATELLITE MAP
(ROUTE)
CLICK HERE TO ENLARGE
DATE:
6th October, 2006
LEG:
Seven
TRANSPORT
Leh-Rumtse
83.09 Km's
COMPETITIVE
Rumtse-Debring
46.40 Km's
TRANSPORT
Debring-Manali
347.20 Km's
LEG START
LEG END
LEH
MANALI
TERRAIN

This stage is run over a long flowing stretches of road for most part. The stage has its share of sharp bends as well. Please don’t get caught out by surprise. It has many a sharp bend on the descent from the Tanglang La. The road surface is rough and undulating for most part of the stage, particularly closer to the pass on both sides. Lower down the hill, it is tarmac and is fast and flowing. Exercise necessary caution while tackling the stage because it has elements that can catch you out easily.

WEATHER
TEMPERATURE:
Hi: 23 Lo:3(In Celsius )
HUMIDITY:
33 %
CLIMATE: Partially Sunny
(Temprature Details Shown Above Are From Raid Start Point- Kargil.)
SPONSORS



[ Home ] [ Contact Us] [ About Us]
Copyright © 2006 www.raid-de-himalaya.com